Brewery Construction and Design Guide – Technical Specifications
Production Areas
Main Processing Zones
| Area | Size (m²/hL) | Height (m) | Floor Load (kN/m²) |
|---|---|---|---|
| Brewhouse | 0.8-1.0 | 6.0-8.0 | 15-20 |
| Fermentation | 0.6-0.8 | 7.0-9.0 | 20-25 |
| Bright Beer | 0.4-0.6 | 6.0-7.0 | 15-20 |
| Packaging | 1.0-1.2 | 5.0-6.0 | 10-15 |
| Storage | 0.5-0.7 | 5.0-6.0 | 15-20 |
Equipment Specifications
Brewhouse Equipment
| Component | Capacity | Power (kW) | Steam (kg/hr) |
|---|---|---|---|
| Mash Tun | 20-50 hL | 5-8 | 500-800 |
| Lauter Tun | 20-50 hL | 3-5 | N/A |
| Kettle | 25-55 hL | 10-15 | 1000-1500 |
| Whirlpool | 25-55 hL | 3-5 | N/A |
| Heat Exchanger | 25-55 hL/hr | 2-3 | 200-300 |
Fermentation/Storage
| Vessel Type | Volume (hL) | Cooling (kW) | Pressure Rating |
|---|---|---|---|
| FV Unitank | 100-200 | 15-20 | 2.5 bar |
| Bright Tank | 100-200 | 10-15 | 3.0 bar |
| Serving Tank | 10-20 | 2-3 | 2.0 bar |
| CIP Tank | 50-100 | N/A | Atmospheric |
| Water Tank | 200-300 | N/A | Atmospheric |
Utility Requirements
Process Systems
| Utility | Consumption/hL | Peak Load | Storage |
|---|---|---|---|
| Steam | 100-150 kg | 2000 kg/hr | N/A |
| Cooling | 80-100 kWh | 200 kW | Ice bank |
| Water | 5-7 hL | 30 hL/hr | 24 hours |
| Compressed Air | 50-70 m³ | 150 m³/hr | Receiver |
| CO₂ Recovery | 3-4 kg | 20 kg/hr | Storage tank |
Electrical Load Distribution
| Area | Load (kW) | Backup | Power Factor |
|---|---|---|---|
| Brewhouse | 100-150 | Optional | 0.85 |
| Cellar | 150-200 | Essential | 0.88 |
| Packaging | 80-120 | Optional | 0.86 |
| Utilities | 200-250 | Essential | 0.90 |
| HVAC | 50-75 | Partial | 0.85 |
Floor Specifications
Surface Requirements
| Area | Material | Load Rating | Chemical Resistance |
|---|---|---|---|
| Brewhouse | Epoxy | 20 kN/m² | High acid |
| Cellar | Polyurethane | 25 kN/m² | High caustic |
| Packaging | Epoxy | 15 kN/m² | Medium |
| Storage | Sealed concrete | 20 kN/m² | Medium |
| Loading | Heavy duty concrete | 30 kN/m² | Low |
Drainage Systems
Process Waste
| Type | Capacity | Material | Slope |
|---|---|---|---|
| Main Drains | 100-150 L/min | Stainless steel | 2% |
| Floor Drains | 50-75 L/min | Stainless steel | 1.5% |
| Trench Drains | 200-300 L/min | Polymer concrete | 1% |
| Effluent Pit | 5000-10000 L | Concrete | N/A |
Construction Costs (USD)
Production Facility
| Component | Cost/hL Capacity | % of Total | Life Cycle |
|---|---|---|---|
| Building Shell | 1000-1500 | 25-30% | 30 years |
| Process Equipment | 2000-3000 | 40-45% | 15-20 years |
| Utilities | 800-1200 | 15-20% | 10-15 years |
| Controls | 400-600 | 10-15% | 7-10 years |
Equipment Investment
| System | Cost Range | Installation | Annual Maintenance |
|---|---|---|---|
| Brewhouse | 500K-1M | 15-20% | 3-5% |
| Fermentation | 400-800K | 10-15% | 2-4% |
| Packaging | 300-600K | 12-18% | 4-6% |
| Utilities | 200-400K | 20-25% | 5-7% |
Environmental Controls
Temperature Requirements
| Area | Temperature (°C) | Humidity (%) | Air Changes/Hour |
|---|---|---|---|
| Brewhouse | 20-25 | 60-70 | 8-10 |
| Fermentation | 15-18 | 50-60 | 6-8 |
| Packaging | 18-22 | 50-60 | 10-12 |
| Storage | 10-15 | 45-55 | 4-6 |
⚠ DISCLAIMER:
The content on PossessionPlanning.com is for informational purposes only. We make no guarantees regarding completeness or reliability. PossessionPlanning.com is an independent platform, not affiliated with or endorsed by any
rail
operator or government agency. Read our
Terms of Use.
The content on PossessionPlanning.com is for informational purposes only. We make no guarantees regarding completeness or reliability. PossessionPlanning.com is an independent platform, not affiliated with or endorsed by any
rail
operator or government agency. Read our
Terms of Use.
// RESOURCES & REFERENCES
// OUR PARTNERS & NETWORK
// SUPPORT OUR MISSION
✨ Help us continue building tools that simplify complexity!
Every contribution fuels new features and improvements.
Thank you for being part of our journey! 🚀
// CONTACT US