Brewery Construction

Brewery Construction and Design Guide – Technical Specifications

Production Areas

Main Processing Zones

Area Size (m²/hL) Height (m) Floor Load (kN/m²)
Brewhouse 0.8-1.0 6.0-8.0 15-20
Fermentation 0.6-0.8 7.0-9.0 20-25
Bright Beer 0.4-0.6 6.0-7.0 15-20
Packaging 1.0-1.2 5.0-6.0 10-15
Storage 0.5-0.7 5.0-6.0 15-20

Equipment Specifications

Brewhouse Equipment

Component Capacity Power (kW) Steam (kg/hr)
Mash Tun 20-50 hL 5-8 500-800
Lauter Tun 20-50 hL 3-5 N/A
Kettle 25-55 hL 10-15 1000-1500
Whirlpool 25-55 hL 3-5 N/A
Heat Exchanger 25-55 hL/hr 2-3 200-300

Fermentation/Storage

Vessel Type Volume (hL) Cooling (kW) Pressure Rating
FV Unitank 100-200 15-20 2.5 bar
Bright Tank 100-200 10-15 3.0 bar
Serving Tank 10-20 2-3 2.0 bar
CIP Tank 50-100 N/A Atmospheric
Water Tank 200-300 N/A Atmospheric

Utility Requirements

Process Systems

Utility Consumption/hL Peak Load Storage
Steam 100-150 kg 2000 kg/hr N/A
Cooling 80-100 kWh 200 kW Ice bank
Water 5-7 hL 30 hL/hr 24 hours
Compressed Air 50-70 m³ 150 m³/hr Receiver
CO₂ Recovery 3-4 kg 20 kg/hr Storage tank

Electrical Load Distribution

Area Load (kW) Backup Power Factor
Brewhouse 100-150 Optional 0.85
Cellar 150-200 Essential 0.88
Packaging 80-120 Optional 0.86
Utilities 200-250 Essential 0.90
HVAC 50-75 Partial 0.85

Floor Specifications

Surface Requirements

Area Material Load Rating Chemical Resistance
Brewhouse Epoxy 20 kN/m² High acid
Cellar Polyurethane 25 kN/m² High caustic
Packaging Epoxy 15 kN/m² Medium
Storage Sealed concrete 20 kN/m² Medium
Loading Heavy duty concrete 30 kN/m² Low

Drainage Systems

Process Waste

Type Capacity Material Slope
Main Drains 100-150 L/min Stainless steel 2%
Floor Drains 50-75 L/min Stainless steel 1.5%
Trench Drains 200-300 L/min Polymer concrete 1%
Effluent Pit 5000-10000 L Concrete N/A

Construction Costs (USD)

Production Facility

Component Cost/hL Capacity % of Total Life Cycle
Building Shell 1000-1500 25-30% 30 years
Process Equipment 2000-3000 40-45% 15-20 years
Utilities 800-1200 15-20% 10-15 years
Controls 400-600 10-15% 7-10 years

Equipment Investment

System Cost Range Installation Annual Maintenance
Brewhouse 500K-1M 15-20% 3-5%
Fermentation 400-800K 10-15% 2-4%
Packaging 300-600K 12-18% 4-6%
Utilities 200-400K 20-25% 5-7%

Environmental Controls

Temperature Requirements

Area Temperature (°C) Humidity (%) Air Changes/Hour
Brewhouse 20-25 60-70 8-10
Fermentation 15-18 50-60 6-8
Packaging 18-22 50-60 10-12
Storage 10-15 45-55 4-6
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO