Coffee Shop Construction

Coffee Shop Construction and Design Guide – Technical Specifications

Spatial Requirements

Area Type Size (m²) Capacity Purpose
Customer Area 1.5-2.0/seat 60% total Seating/dining
Service Counter 0.4/seat 15% total Order/service
Kitchen/Prep 0.5/seat 15% total Food preparation
Storage 0.3/seat 10% total Inventory
Restrooms As per code Customer facilities

Design Parameters

Counter Layout

Component Length (m) Depth (m) Features
POS Station 1.2-1.5 0.7 Display/register
Coffee Station 2.5-3.0 0.9 Equipment space
Display Case 1.5-2.0 0.8 Food display
Pickup Area 1.0-1.5 0.7 Customer collection
Prep Area 1.5-2.0 0.9 Staff workspace

Equipment Requirements

Equipment Power (kW) Space (m²) Ventilation
Espresso Machine 6.5-9.0 1.0 Not required
Grinders 0.5-0.8 each 0.2 Not required
Display Fridge 1.2-1.5 1.2 Not required
Ice Machine 1.5-2.0 0.6 Required
Dishwasher 3.0-4.0 0.8 Required

Technical Systems

Electrical Requirements

Area Load (W/m²) Circuit Type Backup
Counter 250-300 Dedicated Optional
Kitchen 200-250 Dedicated Optional
Seating 50-75 General No
Storage 25-30 General No
Lighting 15-20 Dedicated Emergency

Plumbing Requirements

Service Specification Location Notes
Water Filter 3-stage minimum Main supply Required
Hot Water 50L/100 seats Service area Temperature control
Waste 50mm minimum Under counter Grease trap
Hand Wash Dedicated sink Staff area Health requirement
Floor Drain 100mm Wet areas Required

Interior Finishes

Floor Specifications

Area Material Properties Maintenance
Customer Porcelain tile Non-slip R11 Daily clean
Counter Commercial vinyl Non-slip R12 Hourly sweep
Kitchen Safety tile Non-slip R13 Daily sanitize
Storage Sealed concrete Durable Weekly clean
Restroom Ceramic tile Non-slip R11 Daily sanitize

Wall Finishes

Area Material Height Properties
Customer Paint/Feature Full Washable
Counter SS/Tile 1.2m min Cleanable
Kitchen FRP/Tile 2.1m min Waterproof
Storage Paint Full Durable
Restroom Tile 2.1m min Waterproof

Ventilation Requirements

Area Air Changes/Hour Type Notes
Seating 8-10 Supply/Extract Comfort
Counter 12-15 Supply/Extract Heat removal
Kitchen 15-20 Extract Odor control
Storage 4-6 Supply Fresh air
Restroom 12-15 Extract Odor control

Cost Estimates (USD)

Build Costs

Component Basic/m² Medium/m² High-end/m²
Shell 800-1000 1000-1500 1500-2000
Fit-out 600-800 800-1200 1200-2000
MEP 400-600 600-900 900-1500
Equipment 500-700 700-1000 1000-1800

Equipment Investment

Category Basic Standard Premium
Coffee Machine 15,000 25,000 35,000+
Grinders 2,000 3,500 5,000+
Refrigeration 5,000 8,000 12,000+
POS System 2,000 4,000 6,000+
Small Equipment 5,000 8,000 12,000+

Operational Considerations

Space Flow

Movement Type Width (m) Clearance (m) Notes
Customer Queue 1.2 min 2.0 Clear path
Service Access 0.9 min 1.5 Staff only
Emergency Exit 1.1 min 1.5 Code required
Counter Gap 1.0 min Staff movement
Seating Aisle 1.2 min Customer comfort

Storage Requirements

Type Volume (m³/100 seats) Access Security
Dry Goods 5-7 Daily Lock
Cold Storage 2-3 Multiple Lock
Equipment 3-4 Weekly Lock
Cleaning 1-2 Daily Lock
Waste 2-3 Daily Restricted
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock