Data Centre Construction

Data Centre Design and Construction Guide – Technical Specifications

Tier Classifications

Tier Level Uptime (%) Redundancy Power Density (kW/rack)
Tier I 99.671 N 4-8
Tier II 99.741 N+1 8-12
Tier III 99.982 2N 12-20
Tier IV 99.995 2(N+1) 20+

Power Systems

Power Distribution

Component Redundancy Capacity Monitoring
UPS 2N/2(N+1) 120% design Real-time
PDU 2N 80% rated Per rack
Generators N+1/2N 125% load Continuous
Switchgear 2N 150% rated SCADA
Transformers 2N 100% rated Temperature

Power Requirements

Area Density (kW/m²) Redundancy Backup Time
Server Hall 1.5-3.0 2N 72 hours
Network Room 1.0-1.5 2N 72 hours
Support Areas 0.2-0.4 N+1 24 hours
Offices 0.1-0.2 N 4 hours

Cooling Systems

HVAC Specifications

Parameter Requirement Standard Monitoring
Temperature 18-27°C ASHRAE TC 9.9 Continuous
Humidity 40-60% RH ASHRAE TC 9.9 Real-time
Air Flow Hot/Cold aisle EN 50600 CFD verified
PUE Target <1.3 ISO/IEC 30134 Real-time

Cooling Methods

Type Capacity (kW/rack) Efficiency (PUE) Application
CRAH 8-15 1.4-1.6 Traditional
In-Row 15-30 1.2-1.4 High density
Direct Liquid 30-50 1.1-1.3 Ultra high density
Free Cooling Variable 1.1-1.2 Climate dependent

Physical Infrastructure

Floor Loading

Area Load (kN/m²) Point Load (kN) Safety Factor
Server Floor 12-15 4.5 1.5
Battery Rooms 15-20 6.0 2.0
Equipment Rooms 10-12 3.5 1.5
Loading Areas 20-25 7.0 2.0

Raised Floor Systems

Parameter Specification Standard Testing
Height 600-1200mm EN 12825 Load tested
Panel Rating Class 5/6 MOB PF2 PS Deflection
Pedestal Rating 22kN CISCA Stability
Fire Rating 60 minutes EN 13501 Fire tested

Security Systems

Access Control

Zone Security Level Authentication Monitoring
Perimeter Level 5 Biometric+Card 24/7 CCTV
Data Hall Level 4 Biometric Man-trap
Support Areas Level 3 Card+PIN Access logs
Loading Bay Level 4 Card+CCTV Supervised

CCTV Coverage

Area Camera Type Storage Analytics
External PTZ + Fixed 90 days AI enabled
Internal 360° + Fixed 60 days Motion detect
Critical Areas Thermal 90 days Advanced
Access Points HD + Analytics 90 days Facial recognition

Fire Protection

Detection Systems

Type Coverage Response Time Standard
VESDA All areas <60 seconds EN 54-20
Smoke Double knock <90 seconds EN 54-7
Heat Critical areas <120 seconds EN 54-5
Gas Below floor <30 seconds EN 54-20

Suppression

System Application Agent Response
Gas Server halls NOVEC 1230 <10 seconds
Pre-action General areas Water Double knock
FM200 Electrical Gas <10 seconds
Water Mist Support areas High pressure Zoned

Cost Estimates (USD)

Construction Costs

Component Per m² Per MW Life Cycle
Shell 3,000-4,000 N/A 25 years
MEP 10,000-15,000 8-12M 15 years
Security 500-1,000 N/A 10 years
IT Infrastructure 2,000-3,000 1-2M 5 years

Operating Costs

Item Per kW/month Per rack/month Annual %
Power 150-200 800-1,200 45-55
Cooling 50-75 300-500 25-30
Maintenance 25-40 150-250 10-15
Security 15-25 100-150 5-10
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO