Hotel Construction

Hotel Construction and Design Guide – Technical Specifications

Room Configuration

Room Types and Areas

Room Type Area (m²) Bathroom (m²) % of Total
Standard 28-32 4-5 60-65%
Deluxe 32-38 5-6 20-25%
Suite 45-60 6-8 10-12%
Executive 55-70 8-10 5-8%
Accessible 32-38 7-8 2-3%

Public Areas

Space Allocation

Area Type m²/Room Height (m) Usage Factor
Lobby 1.2-1.5 4.0-5.0 High traffic
Restaurant 1.8-2.2 3.5-4.0 Peak times
Meeting Rooms 0.8-1.2 3.5-4.0 Variable
Fitness Center 0.4-0.6 3.0-3.5 Low traffic
Back of House 2.0-2.5 3.0-3.5 Staff only

Technical Systems

HVAC Requirements

Zone Cooling Load (W/m²) Air Changes/Hour Temperature (°C)
Guest Rooms 100-120 6-8 21-24
Public Areas 150-200 8-10 22-24
Restaurants 200-250 12-15 22-23
Kitchen 250-300 15-20 20-22
Meeting Rooms 150-180 10-12 21-23

Electrical Load Distribution

Area Load (W/m²) Backup UPS
Guest Rooms 60-80 Essential Wi-Fi/Safety
Public Areas 40-50 Full Emergency
Restaurants 150-200 Essential POS
Kitchen 250-300 Critical Refrigeration
IT Systems 100-150 Full All systems

Construction Costs (USD)

Per Room Costs

Hotel Class Shell & Core FF&E Total/Room
Luxury 180-220k 45-55k 225-275k
Upscale 140-180k 35-45k 175-225k
Mid-Scale 100-140k 25-35k 125-175k
Economy 80-100k 15-25k 95-125k

Public Area Costs (per m²)

Area Basic Standard Luxury
Lobby 2000-2500 2500-3500 3500-5000
Restaurant 2500-3000 3000-4000 4000-6000
Meeting 1500-2000 2000-3000 3000-4500
BOH 1000-1500 1500-2000 2000-3000

MEP Systems

Water Supply Requirements

Usage Liters/Room/Day Peak Factor Storage
Guest Rooms 300-400 1.5 1.5 days
F&B 50-75 2.0 1 day
Laundry 100-150 1.8 1 day
Other 50-75 1.3 1 day
Hot Water 150-200 2.0 4 hours

Fire Protection

System Coverage Response Standard
Sprinklers 100% 60 sec NFPA 13
Smoke Detect All areas 30 sec EN 54
Fire Alarm Full building Instant Local code
Extinguishers 30m spacing Manual NFPA 10

FF&E Specifications

Room Furnishings

Item Life Cycle Cost/Room Replacement
Soft Goods 3-4 years 8-12k Phased
Case Goods 7-8 years 12-15k Complete
Bathroom 10-12 years 15-20k Complete
Technology 4-5 years 5-8k As needed

Operational Systems

Building Management

System Function Control Monitoring
PMS Operations Central 24/7
BMS MEP Systems Automated Real-time
Security Access/CCTV Integrated 24/7
Energy Management Smart Continuous
Maintenance Tracking Digital Daily

Maintenance Requirements

Preventive Schedule

System Frequency Type Annual Cost/Room
HVAC Monthly Technical $800-1000
Electrical Quarterly Inspection $400-600
Plumbing Monthly Service $500-700
FF&E Quarterly Inspection $600-800
Life Safety Monthly Testing $300-400
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO