Construction Methodology

All about construction, in simple words.

Retail Shop Construction

Retail Shop Construction Guide – Shopping Centre Fitout Specifications

Space Planning

Area Allocation

Zone % of Total Purpose Min. Width (m)
Sales Floor 65-75% Display/Customer 6.0
Storage 15-20% Stock/Inventory 3.0
Staff Area 5-8% Employee facilities 2.5
POS Area 5-7% Transaction space 2.0
Fitting Rooms* 8-10% Customer try-on 1.5/room

*Where applicable

Shop Front Design

Mall Interface

Element Specification Material Options Standard
Entry Width 3.0-6.0m Glass/Metal Center rules
Signage Zone 600-900mm LED/Lightbox Center guide
Security Shutter Full width Perforated/Solid Fire rated
Floor Finish Mall to shop Flush transition <2mm gap
Ceiling Height 3.0-3.6m Exposed/Feature Center height

Technical Services

Electrical Requirements

Area Load (W/m²) Circuit Type Emergency
Sales Floor 40-50 Lighting Yes
Display Windows 100-150 Track lighting Yes
POS 250-300 Dedicated UPS
Storage 15-20 General Limited
Signage 200-300 Dedicated Optional

HVAC Specifications

Parameter Requirement Control Notes
Temperature 21-23°C BMS/Local Mall supply
Fresh Air 10L/s/person Center system Base building
Exhaust 1.5 ACH Local control If required
Humidity 40-60% Mall system Monitored

Interior Finishes

Floor Options

Type Cost/m² Durability Maintenance
Porcelain Tile $80-120 High Low
Luxury Vinyl $60-90 Medium Medium
Polished Concrete $70-100 High Low
Carpet Tile $45-75 Medium High

Wall Finishes

Location Material Height Finish
Sales Area Paint/Feature Full Washable
Storage Paint Full Durable
Fitting Rooms Fabric/Paint Full Cleanable
Display Walls Feature/Slat Variable Brand specific

Lighting Design

Illumination Levels

Area Lux Level Type Control
General Sales 800-1000 LED track Dimmable
Feature Display 1500-2000 Spot lights Scene set
POS Counter 500-750 Downlights Switch
Storage 200-300 Linear LED Motion
Fitting Rooms 400-600 Vertical Switch

Storage Systems

Fixture Specifications

Type Load Rating (kg/m) Height (m) Access
Wall Bay 80-120 2.4-2.7 Single side
Gondola 100-150 1.5-1.8 Double side
Stock Room 150-200 2.4-3.0 Adjustable
Heavy Duty 200-300 2.4-3.0 Pallet access

Cost Estimates (USD/m²)

Fitout Costs

Category Basic Standard Premium
Shell Works 200-300 300-400 400-600
Services 150-200 200-300 300-400
Finishes 250-350 350-450 450-650
Fixtures 200-300 300-450 450-700

Equipment Investment

Item Cost Range Life Cycle
POS System $3,000-5,000/unit 3-5 years
Security System $5,000-8,000 5-7 years
Digital Displays $2,000-4,000/unit 3-4 years
Audio System $3,000-5,000 5-7 years

Security Requirements

Systems Integration

Component Coverage Monitoring Recording
CCTV Full floor Center security 30 days
EAS Gates Entry points Local alert Real-time
Panic Button POS/Staff Center response Logged
Stock Control Storage access Key control Tracked

Operational Infrastructure

IT/Communications

Service Bandwidth Backup Security
POS Network 50Mbps 4G PCI DSS
Wi-Fi 100Mbps Center Wi-Fi WPA3
Phone System VOIP Cellular Encrypted
Security Feed 10Mbps Local storage Secured
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO