Route Classification Standards
| Class |
Width (m) |
Height (m) |
Load Rating (tonnes) |
Surface Type |
Grade Max (%) |
| A1 |
7.5+ |
5.5+ |
150+ |
Engineered/Sealed |
8 |
| A2 |
6.5-7.5 |
4.8-5.5 |
100-150 |
Sealed/Compacted |
10 |
| B1 |
5.5-6.5 |
4.5-4.8 |
80-100 |
Compacted |
12 |
| B2 |
4.5-5.5 |
4.2-4.5 |
60-80 |
Graded |
15 |
| C |
3.5-4.5 |
3.8-4.2 |
40-60 |
Basic |
20 |
Clearance Requirements
| Vehicle Type |
Horizontal (m) |
Vertical (m) |
Turning Circle (m) |
Passing Bay Interval (m) |
| Heavy Haul |
8.0 |
5.5 |
35.0 |
200 |
| Construction |
6.0 |
4.8 |
25.0 |
300 |
| Service Vehicle |
4.0 |
4.2 |
15.0 |
400 |
| Emergency |
3.5 |
4.0 |
12.0 |
500 |
| Light Vehicle |
3.0 |
2.8 |
8.0 |
N/A |
Surface Requirements
| Traffic Type |
CBR Rating |
Surface Type |
Maintenance Interval |
Weather Capability |
| Heavy Load |
80+ |
Concrete/Heavy Duty |
5 years |
All weather |
| Regular Heavy |
60-80 |
Asphalt/Sealed |
3 years |
All weather |
| Medium Load |
40-60 |
Stabilized/Gravel |
12 months |
Weather dependent |
| Light Load |
30-40 |
Compacted |
6 months |
Fair weather |
| Temporary |
20-30 |
Graded |
3 months |
Dry weather |
Structural Requirements
| Access Type |
Bridge Rating (t) |
Culvert Rating (t) |
Side Protection |
Drainage |
| Primary |
150+ |
150+ |
Barriers |
Engineered |
| Secondary |
100-150 |
100-150 |
Guide posts |
Standard |
| Construction |
80-100 |
80-100 |
Markers |
Basic |
| Temporary |
60-80 |
60-80 |
Delineators |
Temporary |
| Emergency |
40-60 |
40-60 |
Visual |
Natural |
| Parameter |
Primary |
Secondary |
Construction |
Temporary |
| Design Speed (km/h) |
60 |
40 |
30 |
20 |
| Min. Curve Radius (m) |
100 |
60 |
40 |
25 |
| Max. Grade (%) |
8 |
10 |
12 |
15 |
| Cross Fall (%) |
3 |
4 |
5 |
6 |
| Sight Distance (m) |
80 |
60 |
40 |
30 |
Critical Considerations
Key factors include:
. Load bearing capacity
. Weather resistance
. Maintenance access
. Emergency access
. Environmental impact
. Future upgrades
Safety Requirements
Essential elements:
. Traffic management
. Signage systems
. Lighting requirements
. Emergency protocols
. Communication systems
. Monitoring procedures
Documentation Requirements
| Document Type |
Update Frequency |
Distribution |
Approval Level |
| Route Surveys |
6 months |
Project team |
Engineer |
| Load Ratings |
12 months |
Operations |
Authority |
| Maintenance Plans |
3 months |
Maintenance |
Manager |
| Emergency Plans |
6 months |
All users |
Safety Officer |
| Traffic Plans |
Monthly |
Site control |
Supervisor |