Constant Slope Barrier

Constant Slope Barrier – Technical Specification Guide

Standard Dimensions

Parameter Measurement Tolerance Purpose
Height 810mm ±10mm Vehicle containment
Base Width 570mm ±5mm Stability
Top Width 180mm ±5mm Impact surface
Length 3050mm ±15mm Standard unit
Face Slope 79° (constant) ±1° Vehicle redirect
Weight 2.2 tonnes ±0.1t Unit mass
Drainage Slot 100x100mm ±5mm Water flow

Design Features

Feature Specification Benefit Performance
Single Slope 79° continuous Predictable impact Consistent redirection
No Snag Points Smooth profile Reduced vehicle damage Enhanced safety
Continuous Base Full contact Stable foundation Better load distribution
Symmetrical Design Both sides equal Bi-directional use Installation flexibility
Integral Drainage Through-slots Water management Reduced ponding

Performance Ratings

Test Level Vehicle Type Mass (kg) Speed (km/h) Impact Angle (°)
TL-4 Single Unit Truck 8,000 80 15
TL-4 Pickup Truck 2,270 100 25
TL-4 Passenger Car 1,100 100 25
TL-3 Pickup Truck 2,270 100 25
TL-2 Passenger Car 1,100 70 25

Material Requirements

Component Specification Strength Standard
Concrete Class 40/50 40 MPa ASTM C31
Primary Rebar #5 (16mm) Grade 60 ASTM A615
Stirrups #4 (13mm) Grade 60 ASTM A615
Connection Steel Grade 50 350 MPa ASTM A36
Lifting Points Grade 50 350 MPa ASTM A36

Installation Parameters

Parameter Requirement Tolerance Verification
Foundation 150mm Type 1 ±25mm Compaction test
Alignment String line ±15mm Survey check
Grade Design level ±10mm Level survey
Joint Width 15mm +5mm/-0mm Gap measure
Anchoring As specified ±5mm Template check

Connection Systems

Type Components Rating Application
Pin & Loop 32mm pin TL-4 Permanent
Plate Connection 200x200mm TL-4 Structure mount
Quick Release Drop pin TL-3 Temporary
Bridge Mount Anchor bolt TL-4 Bridge transition
End Terminal Impact head TL-3 Terminal section

Maintenance Schedule

Activity Frequency Scope Action Required
Visual Inspection Monthly Surface condition Document/Repair
Joint Check Quarterly Connection integrity Adjust/Replace
Level Survey Annually Position verification Realign if needed
Impact Inspection Post-incident Damage assessment Replace if needed
Drainage Check Monthly Clear slots Clean/Maintain

Repair Criteria

Damage Type Assessment Action Timeline
Surface Spall <50mm deep Patch repair 1 month
Deep Spall >50mm deep Unit replacement 1 week
Cracking >0.3mm width Epoxy injection 2 weeks
Joint Damage Any Replace hardware 24 hours
Misalignment >25mm Realignment 1 week
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock