TL-3 Barrier Rating – Technical Specification Guide

Test Level Overview

Parameter Specification Tolerance Purpose
Test Speed 100 km/h +2/-0 km/h High containment
Impact Angle 25 degrees ±1.5° Standard impact
Vehicle Mass 2,270 kg ±45 kg Design vehicle
Impact Energy 165.8 kJ ±5 kJ Energy absorption
Deflection Limit 2.1m +0.3m Working width

Vehicle Test Requirements

Vehicle Type Mass (kg) Speed (km/h) Angle (°) Exit Box Criteria
Pickup Truck 2,270 100 25 Required
Passenger Car 1,100 100 25 Required
Small Car 820 100 20 Required
Test Article N/A N/A N/A No penetration
Occupant Risk THIV ≤33 ft/s PHD ≤20g ASI ≤1.4 Required

Performance Criteria

Criterion Requirement Measurement Acceptance
Structural Adequacy A No penetration Pass/Fail
Occupant Risk D,F,H,I Within limits Pass/Fail
Vehicle Trajectory L,M Controlled exit Pass/Fail
Post Impact K No detachment Pass/Fail
Working Width W6 max ≤2.1m Measure

Compliant Barrier Systems

Barrier Type Height (mm) Width (mm) Post Spacing (m) Application
Strong Post W-Beam 706 180 1.905 Highways
Thrie Beam 813 245 1.905 Transitions
Modified Thrie Beam 813 245 0.952 High risk
Concrete Safety Shape 810 600 Continuous Rigid barrier
High-Tension Cable 750 200-300 3.0-3.2 Medians

Installation Requirements

Parameter Specification Tolerance Verification
Post Embedment 1.1m minimum +50/-0 mm Measure
Rail Height As designed ±20mm Level check
Soil Strength 20 kPa minimum N/A Test
Block Height 360mm ±10mm Measure
Foundation Grade 1:10 max ±1% Survey

Maintenance Schedule

Component Frequency Check Points Action Required
Rail Elements Monthly Damage/alignment Repair/replace
Posts Quarterly Stability/alignment Reset/replace
Hardware Monthly Tightness/corrosion Tighten/replace
Foundations Semi-annual Erosion/stability Repair/reinforce
End Treatments Monthly Damage/alignment Repair/replace

Repair Criteria

Damage Type Assessment Action Timeline
Rail Damage >75mm deflection Replace 24 hours
Post Damage Any movement Replace 48 hours
Hardware Loss Any missing Replace 24 hours
Alignment >50mm offset Realign 1 week
End Treatment Any damage Replace 24 hours

Documentation Requirements

Document Content Update Distribution
As-Built Installation details Per install Project file
Inspection Condition report Monthly Maintenance
Repair Log Work completed Per repair Asset manager
Impact Report Incident details Per event Safety team
Test Results Compliance data Per batch Quality control
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO