TL-4 Barrier

TL-4 Barrier Rating – Technical Specification Guide

Test Level Overview

Parameter Specification Tolerance Purpose
Test Speed 80 km/h +2/-0 km/h Heavy vehicle containment
Impact Angle 15 degrees ±1.5° SUT impact
Vehicle Mass 8,000 kg ±100 kg Design vehicle
Impact Energy 209.3 kJ ±7 kJ Energy absorption
Deflection Limit 1.5m +0.3m Working width

Vehicle Test Requirements

Vehicle Type Mass (kg) Speed (km/h) Angle (°) Exit Box Criteria
Single Unit Truck 8,000 80 15 Required
Pickup Truck 2,270 100 25 Required
Passenger Car 1,100 100 25 Required
Test Article N/A N/A N/A No penetration
Occupant Risk THIV ≤33 ft/s PHD ≤20g ASI ≤1.4 Required

Performance Criteria

Criterion Requirement Measurement Acceptance
Structural Adequacy A,D No penetration Pass/Fail
Occupant Risk D,F,H,I Within limits Pass/Fail
Vehicle Trajectory L,M Controlled exit Pass/Fail
SUT Stability G No rollover Pass/Fail
Working Width W5 max ≤1.5m Measure

Compliant Barrier Systems

Barrier Type Height (mm) Width (mm) Strength Rating Application
F-Shape Concrete 1070 610 209.3 kJ Bridges/Highways
Single Slope 1070 610 209.3 kJ High risk areas
Vertical Wall 1070 450 209.3 kJ Limited space
Modified Thrie Beam 915 245 209.3 kJ Transitions
Heavy Post W-Beam 813 180 209.3 kJ Special applications

Installation Requirements

Parameter Specification Tolerance Verification
Foundation 200mm Type 1 ±25mm Compaction test
Alignment String line ±15mm Survey check
Level Design grade ±10mm Digital level
Joint Width 20mm +10mm/-5mm Gap measure
Anchoring As designed ±5mm Template check

Maintenance Schedule

Component Frequency Check Points Action Required
Structure Monthly Damage/cracks Document/Repair
Joints Quarterly Integrity/alignment Adjust/Replace
Anchors Semi-annual Tightness/corrosion Tighten/Replace
Drainage Monthly Blockage/flow Clean/Repair
Transitions Quarterly Connection/alignment Adjust/Repair

Repair Criteria

Damage Type Assessment Action Timeline
Structural Damage Any Replace unit 24 hours
Surface Spall >75mm Patch repair 1 week
Joint Damage Any Replace hardware 48 hours
Alignment >25mm Realign 1 week
Foundation Issue Any Investigate/Repair 24 hours

Documentation Requirements

Document Content Frequency Distribution
Installation Record As-built details Per install Project file
Inspection Reports Condition status Monthly Maintenance
Repair Records Work completed Per repair Asset manager
Impact Reports Incident details Per event Safety team
Test Certificates Compliance data Per batch Quality control
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock