Single Slope Barrier

Single Slope Barrier – Technical Specification Guide

Standard Dimensions

Parameter Measurement Tolerance Purpose
Height 1070mm ±10mm Enhanced containment
Base Width 610mm ±5mm Stability
Top Width 200mm ±5mm Impact surface
Length 3050mm ±15mm Standard unit
Face Slope 76.5° (constant) ±1° Vehicle redirect
Weight 2.8 tonnes ±0.1t Unit mass
Drainage Slot 100x150mm ±5mm Water flow

Performance Specifications

Test Level Vehicle Type Mass (kg) Speed (km/h) Impact Angle (°) Rating
TL-5 Tractor-Trailer 36,000 80 15 Pass
TL-5 Single Unit Truck 8,000 80 15 Pass
TL-5 Pickup Truck 2,270 100 25 Pass
TL-5 Passenger Car 1,100 100 25 Pass
TL-4 Single Unit Truck 8,000 80 15 Pass

Material Requirements

Component Specification Strength Standard
Concrete Class 50 50 MPa ASTM C31
Primary Rebar #6 (19mm) Grade 60 ASTM A615
Stirrups #4 (13mm) Grade 60 ASTM A615
Connection Steel Grade 50 350 MPa ASTM A36
Anchor Bolts Grade 8.8 800 MPa ASTM F568M

Reinforcement Layout

Location Bar Size Spacing Coverage
Vertical Face #6 (19mm) 200mm 50mm
Horizontal Face #5 (16mm) 300mm 50mm
Top Section #4 (13mm) 200mm 40mm
Base Section #6 (19mm) 150mm 75mm
Stirrups #4 (13mm) 300mm N/A

Installation Requirements

Parameter Specification Tolerance Verification
Foundation 200mm Type 1 ±25mm Compaction test
Alignment String line ±15mm Survey check
Level Design grade ±10mm Digital level
Joint Width 20mm +10mm/-5mm Gap measure
Anchoring As designed ±5mm Template check

Connection Systems

Type Components Rating Application
Pin & Loop 38mm pin TL-5 Standard joint
Structure Mount Base plate TL-5 Bridge/wall
Transition Variable height TL-5 Height change
End Terminal Impact head TL-4 Terminal section
Emergency Opening Quick release TL-4 Access point

Maintenance Requirements

Item Frequency Action Criteria
Visual Inspection Monthly Document condition No damage
Joint Check Quarterly Verify connections Tight/aligned
Level Survey Annually Check alignment Within tolerance
Impact Check Post-incident Assess damage Structural integrity
Drainage Monthly Clear slots No blockage

Repair Specifications

Damage Type Severity Action Timeline
Surface Spall <75mm Patch repair 1 month
Deep Spall >75mm Replace unit 1 week
Cracking >0.3mm Epoxy injection 2 weeks
Joint Damage Any Hardware replacement 24 hours
Base Movement >25mm Realignment 1 week
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock

Subscribe