Refinery Construction Plant and Equipment: 50 Example Fleets by Work Type

This page provides 50 example plant and equipment mixes for different stages of
refinery and large process plant projects – site prep, foundations, structural steel, vessels,
piping, tanks, flare systems, utilities, shutdowns and rehabilitation.

Each card represents a practical plant + equipment fleet that works together as a system.
Use these as starting points when developing methodology‑led estimates, programmes and
Efficient Construction Cost (ECC) models. Always adjust for your specific
process units, layout, live‑plant interfaces, materials and safety rules (including hazardous areas).

Site Preparation & Civil Earthworks

1. Greenfield Refinery Site Bulk Earthworks

Use case: Cut/fill to create plant, tank farm and utility areas.

Plant & Equipment Mix

  • 3–4 × 30–50 t excavators
  • 8–12 × 25–30 t articulated dump trucks
  • 2 × Dozers (D8–D10) for bulk push/levelling
  • 2 × Graders with GPS control
  • 3 × Smooth drum / padfoot rollers
  • 2 × Watercarts

2. Brownfield Expansion Earthworks

Use case: Extend or upgrade units inside operating refinery.

Plant & Equipment Mix

  • Compact 8–20 t excavators for constrained areas
  • Skid steers for tight workfaces
  • Small dumpers or tip trucks
  • Compact rollers and plate compactors
  • Dedicated spotters and fire watch equipment

3. Process Unit Pad Formation

Use case: Fineshed formation for piperacks, equipment and structures.

Plant & Equipment Mix

  • 20–30 t excavators
  • Grader with 3D/GPS
  • Padfoot & smooth drum rollers
  • Skid steer for final trims

4. Roads & Access within Refinery Plot

Use case: Internal roads, laydowns and fire tender access routes.

Plant & Equipment Mix

  • Graders & rollers
  • Asphalt or granular surfacing plant
  • Watercart & dust suppression

Foundations, Piles & Structural Concrete

5. Piled Foundations for Process Structures

Use case: Piled caps for pipe racks, columns and heavy equipment.

Plant & Equipment Mix

  • CFA or driven pile rig (diameter to design)
  • 80–150 t crane for cages/casings
  • Concrete pump & agitators
  • Excavator for pile caps and trimming

6. Strip & Pad Footings in Process Units

Use case: Foundations for equipment skids and pipe supports.

Plant & Equipment Mix

  • Mini/midi excavators (5–14 t)
  • Plate compactors
  • Concrete line pump
  • Light crane/telehandler for formwork & reo

7. Equipment Foundation Blocks

Use case: Large inertia blocks for compressors, pumps and rotating equipment.

Plant & Equipment Mix

  • 20–30 t excavator
  • Formwork systems & anchor bolt templates
  • Concrete pump & vibrators
  • Survey instruments for level/tolerance

8. Piperack Foundations

Use case: Strip/pile caps and columns for multi‑level piperacks.

Plant & Equipment Mix

  • Piling rig (if deep foundations)
  • Mini/midi excavators for pile caps and strip footings
  • Concrete pump
  • Small crane for rebar cages

Structural Steel, Piperacks & Access Structures

9. Piperack Steel Erection

Use case: Multi‑bay piperacks through process units.

Plant & Equipment Mix

  • 80–200 t mobile cranes (depending on reach and bay size)
  • Telehandlers for secondary steel
  • MEWPs (boom lifts) for bolting, bracing and access platforms
  • Torque tools and survey gear for plumb/line

10. Process Structure Steel Frames

Use case: Steel structures around columns, reactors, vessels.

Plant & Equipment Mix

  • 200–400 t crane (for tall/heavy frames)
  • Smaller assist cranes/telehandlers
  • MEWPs for connection and deck installation

11. Access Platforms, Stairs & Ladders

Use case: Steel stairs, landings and access platforms throughout units.

Plant & Equipment Mix

  • Telehandler for prefabricated platform modules
  • Scissor lifts/MEWPs for fix‑off and guardrails
  • Light crane truck in tight units

12. Pipe Support Steel along Piperacks

Use case: Secondary steel supports, guides and shoes.

Plant & Equipment Mix

  • Telehandlers
  • MEWPs
  • Hand tools, welders and torque equipment

Vessels, Columns & Heavy Lifts

13. Vertical Column Installation

Use case: Distillation columns and reactors erected in process units.

Plant & Equipment Mix

  • 400–800 t crawler or mobile crane (depending on height/weight)
  • Tail crane (200–400 t) for upending
  • Skates and jacks for positioning at grade
  • MEWPs for nozzle and platform hook‑up

14. Horizontal Vessel Installation

Use case: Drums, exchangers and horizontal pressure vessels.

Plant & Equipment Mix

  • 150–300 t mobile crane
  • Skates, rollers and jacks for final alignment
  • MEWPs for support and piping connections

15. Modular Skid Lifts

Use case: Prefabricated skid modules (pumps, exchangers, filters).

Plant & Equipment Mix

  • 80–200 t mobile cranes
  • Forklifts/telehandlers for smaller skids
  • MEWPs for interconnection piping and cabling

16. Heavy Lift Planning Test Setup

Use case: Trial rigging and clearances for critical lifts.

Plant & Equipment Mix

  • Cranes used for final lifts (at test loads/angles)
  • Test weights and load cells
  • Survey monitoring and clash detection tools

Piping – Process, Utility & Offsite

17. Pipe Spool Delivery & Setting on Racks

Use case: Install shop‑fabricated spools onto piperacks and structures.

Plant & Equipment Mix

  • Cranes (80–150 t) for main lines
  • Telehandlers for smaller spools
  • MEWPs for bolt‑up and welding at height

18. Underground Process/Utility Pipework

Use case: Buried lines between units and tank farms.

Plant & Equipment Mix

  • Mini/midi excavators with trench shields
  • Pipe fusion/welding rigs
  • Plate compactors and small rollers
  • Vac trucks for service proving

19. Above‑Ground Utility Pipe Racks

Use case: Steam, condensate, nitrogen, instrument air, cooling water.

Plant & Equipment Mix

  • Telehandlers and forklifts
  • MEWPs for support install and pipe placement
  • Welding sets, preheat gear and NDT equipment

20. Flare & Relief Header Piping

Use case: Large bore flare headers around site.

Plant & Equipment Mix

  • Cranes for header sections
  • MEWPs/rope access (if elevated)
  • Welding & PWHT (post‑weld heat treatment) equipment

Tank Farms, Bunds & Associated Works

21. Tank Pad Formation

Use case: Form and compact tank foundations and ring walls.

Plant & Equipment Mix

  • 20–30 t excavator
  • Grader and rollers
  • Plate compactors near ring walls
  • Survey gear for level and slope control

22. Above‑Ground Storage Tank Shell Lifting

Use case: Erect large diameter crude/product tanks.

Plant & Equipment Mix

  • Hydraulic jacking system or large crawler cranes
  • Shell plate handling gear (vacuum lifters or clamps)
  • Scaffolding/MEWPs inside/outside shell

23. Bund (Dike) Construction

Use case: Earthen or concrete containment around tanks.

Plant & Equipment Mix

  • Excavators and dozers
  • Rollers and watercarts
  • Liner installation gear (if lined)
  • Rockwork/riprap placement plant for slopes

24. Tank Farm Piping & Manifolds

Use case: Suction/discharge lines, manifolds and pump piping.

Plant & Equipment Mix

  • Mini/midi excavators for trenching
  • Pipe welding/fusion equipment
  • Crane truck for valves and manifolds
  • Compaction plant and testing gear

Flare Systems, Stacks & High Structures

25. Flare Stack Foundation & Piles

Use case: Deep foundations for tall flare stack.

Plant & Equipment Mix

  • Piling rig (bored or driven, as designed)
  • Crane for cages and anchors
  • Concrete pump and mixers
  • Survey for anchor bolt templates

26. Flare Stack Erection

Use case: Install single tall flare or multiple‑head towers.

Plant & Equipment Mix

  • Heavy lift crane (400–800 t) or gin pole system
  • Tail crane or temporary guy systems
  • MEWPs or rope access for head installation

27. Flare Header & Knockout Drum

Use case: Civil and mechanical works at flare KO drum.

Plant & Equipment Mix

  • Civil plant (excavators, formwork, concrete pump)
  • Cranes for drum and header pieces
  • Piping installation fleet

Electrical, Instrumentation & Control Rooms

28. Substations & MCC Building Fit‑Out

Use case: MV/LV switchgear, MCCs and drives installation.

Plant & Equipment Mix

  • Forklifts / pallet jacks for switchgear
  • Small cranes/gantries inside buildings
  • Scissor lifts for cable trays & bus duct

29. Cable Ladder & Tray Installation across Plant

Use case: Extensive tray runs along piperacks and structures.

Plant & Equipment Mix

  • MEWPs along piperacks
  • Telehandlers for tray and support steel
  • Hand tools for fixing brackets and supports

30. MV/LV Cable Pulling

Use case: Power, control and instrumentation cables to units.

Plant & Equipment Mix

  • Cable drum stands
  • Cable winches and rollers
  • Test equipment (megger, OTDR for fibre)

31. Instrumentation & Control Panel Install

Use case: Field instruments, marshalling cabinets, analyzers.

Plant & Equipment Mix

  • Scissor lifts/MEWPs for instruments at height
  • Portable test/calibration sets
  • Small cranes for analyzer shelters and cabinets

Shutdowns, Turnarounds & Live‑Plant Works

32. Turnaround Scaffolding & Access

Use case: Large shutdown with extensive scaffolding in process units.

Plant & Equipment Mix

  • Scaffold material and erection crews
  • Telehandlers/forklifts for tube & fittings
  • MEWPs to supplement scaffold access

33. Heat Exchanger Pull & Refurbishment

Use case: Remove, refurbish and reinstall exchangers during shutdown.

Plant & Equipment Mix

  • 80–200 t mobile crane or gantry/monorail systems
  • Skates and rollers
  • Tube cleaning and inspection rigs

34. Column/Tower Internal Works

Use case: Tray/baffle replacement and internal inspections.

Plant & Equipment Mix

  • Confined space access gear
  • Portable internal access platforms
  • Specialist lifting devices inside shells

35. Hot Tap & Tie‑In Works

Use case: New connections onto live lines (where permitted).

Plant & Equipment Mix

  • Hot tap machines and isolation tools
  • MEWPs or scaffold for access at height
  • Welding and NDT plant

36. Coating & Insulation Renewal

Use case: Replace CUI‑affected insulation and coatings.

Plant & Equipment Mix

  • Scaffolds/MEWPs
  • Insulation removal tools and cutting gear
  • Blasting/UHP water jetting and coating pumps

Demolition, Decommissioning & Rehabilitation

37. Decommissioning Old Process Units

Use case: Demolish redundant units in phased programme.

Plant & Equipment Mix

  • 30–50 t excavators with shears and pulverisers
  • High‑reach excavator (if necessary)
  • Skid steers and loaders for debris
  • Trucks for scrap/waste removal

38. Tank Demolition & Removal

Use case: Cut and remove above‑ground storage tanks.

Plant & Equipment Mix

  • Excavators with shears, or manual cutting and controlled collapse
  • Cranes for lifting shell segments (if staged removal)
  • Skid steers/trucks for scrap handling

39. Underground Services Removal & Blinding

Use case: Remove or inert old pipelines and ducts.

Plant & Equipment Mix

  • Mini/midi excavators
  • Vac trucks and flushing systems
  • Foam/ grout fill injection pumps

40. Site Remediation & Capping

Use case: Soil remediation and long‑term capping after decommissioning.

Plant & Equipment Mix

  • 20–30 t excavators
  • Haul trucks for contaminated soil
  • Stabiliser or mixing plant (in‑situ treatment if used)
  • Graders and rollers for capping layers

Specialty Systems & Safety‑Critical Work

41. Firewater & Foam Systems

Use case: Fire rings, monitors and deluge systems across refinery.

Plant & Equipment Mix

  • Trenchers or excavators
  • Pipe fusion/welding rigs
  • MEWPs for elevated deluge and monitors
  • Hydrotest gear

42. Blast/Fire‑Rated Offices & Control Rooms

Use case: Modular blast‑rated buildings within process area.

Plant & Equipment Mix

  • 200–400 t crane (if large modules)
  • Crane trucks for smaller modules
  • Skates/jacks for alignment

43. Access & Egress Upgrades

Use case: Extra stair towers, escape ladders, emergency platforms.

Plant & Equipment Mix

  • Telehandlers for stair modules
  • MEWPs for connections
  • Hand tools and torque equipment

44. Gas Detection & Safety Instrumentation Retrofits

Use case: New gas detectors, ESD pushbuttons, beacons.

Plant & Equipment Mix

  • Scissor lifts/MEWPs
  • Portable test/calibration kits
  • Cable pulling and termination tools

Survey, Monitoring & ECC/TOC Pilot Works

45. 3D Laser Scan & As‑Built Survey

Use case: Capture complex brownfield geometry before expansion.

Plant & Equipment Mix

  • Laser scanners and total stations
  • Access platforms/MEWPs
  • ATEX/EX‑rated equipment in classified zones

46. Structural Monitoring of Critical Units

Use case: Monitor differential settlement or deflection during works.

Plant & Equipment Mix

  • Survey prisms and robotic total stations
  • Vibration/strain gauges and data loggers
  • Access ladders and small scaffolds

47. Vibration & Noise Monitoring During Piling/Demolition

Use case: Protect operating plant and neighbours.

Plant & Equipment Mix

  • Portable vibration monitors
  • Noise meters & loggers
  • Temporary barriers or screening plant

48. ECC/TOC Pilot for Modular vs Stick‑Built Approach

Use case: Trial modular skids vs stick‑built for a small unit.

Plant & Equipment Mix

  • Modular lift cranes
  • Stick‑built assembly tools
  • Instrumentation to capture installation time, rework and safety performance

49. Pilot Section for New Coating/Insulation System

Use case: Test new CUI mitigation system on limited area.

Plant & Equipment Mix

  • Blasting/UHP jetting kit
  • Coating pumps & insulation tools
  • Scaffolds/MEWPs

50. Integrated ECC/TOC Methodology Review Zone

Use case: Trial combined civil/structural/mechanical methodology in a test area.

Plant & Equipment Mix

  • A representative mini‑fleet from civil, structural, piping & E&I
  • Full safety and permitting regime as per live works
  • Monitoring tools for productivity, rework, access conflicts

Need Help Selecting or Optimising Refinery Plant and Equipment Mixes?

These example fleets are starting points only. On a live refinery or process plant project, the optimal
plant and equipment mix depends on:

  • Unit layout, elevation and modularisation strategy
  • Interface with live operations, shutdown windows and hazardous area rules
  • Ground conditions, tank farm layout and offsite/utility constraints
  • Required production, safety constraints and ECC/TOC objectives

We can help you:

  • Develop methodology‑led plant and equipment mixes for each refinery work package
  • Align staging, modularisation and shutdown planning with realistic productivity and Efficient Construction Cost (ECC)
  • Compare construction strategies (stick‑built vs modular, day vs night, unit‑by‑unit shutdowns) on a time–cost–risk basis
  • Feed real project learning back into future refinery bids and planning

Use the form below to discuss your project.

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO