s All site office and work sheds are to be located on-site. Where this is not possible, a Type B Hoarding is to be erected to facilitate the placement of sheds on top of the deck of the Type B hoarding. Any such sheds shall be appropriately tied down to the deck by suitable structural fixings and certified by a suitably qualified and experienced structural engineer. The provision of an affixed screen or fascia to the Type B hoarding is required, in order to minimise the visual impact of any office sheds atop of the deck of the hoarding. The minimum height of the screen / fascia is 1 metre above the hoarding deck line. The fascia screen shall be constructed of a durable material such as marine or exterior grade plywood. The fascia screen shall be painted white and may include some limited corporate signage of the building companies and / or visual graphic, in order to provide visual interest to the screen. The extent of any advertising or corporate signage shall be restricted to less than 10% of the total area of the screen.