AUSGRID
- Decommissioning and returning assets (PDF – LINK)
- NS190 Oil Containment Operational Requirements for Major Substations (Construction Methodology – LINK)
- NS130 Laying Underground cables up to and including 11kV (LINK)
- NS174 Environmental Procedures (Link)
- NS174B Environmental Assessment Guidelines (Link)
- NS174C Environmental Handbook for Construction and Maintenance (Link)
- Update 14th August 2017 (LINK)
TfNSW
- Airspace and External Developments (LINK)
- HV Aerial Line Maintenance Standard (LINK)
- Work On or Near Cables: High Voltage, 1500V and LV Distribution Networks (Link)
- HV Earthing for Suibstations and Distributions Systems TS 03726:1.0, EP 12 10 00 10 SP (LINK)
Construction Activities
- Relocation of rail tracks
- Installation of trackside equipment
- Installation of overhead wire footings
- Civil earthworks and drainage work
- Delivery of plant and materials
- Relocating high-voltage power utilities
- Bridge pier piling works.
TRANSGRID
- Environmental Handbook (LINK)