AUSGRID

  • Decommissioning and returning assets (PDFLINK)
  • NS190 Oil Containment Operational Requirements for Major Substations (Construction Methodology – LINK)
  • NS130 Laying Underground cables up to and including 11kV (LINK)
  • NS174 Environmental Procedures (Link)
  • NS174B Environmental Assessment Guidelines (Link)
  • NS174C Environmental Handbook for Construction and Maintenance (Link)
    • Update 14th August 2017 (LINK)

TfNSW

  • Airspace and External Developments (LINK)
  • HV Aerial Line Maintenance Standard (LINK)
  • Work On or Near Cables: High Voltage, 1500V and LV Distribution Networks  (Link)
  • HV Earthing for Suibstations and Distributions Systems TS 03726:1.0, EP 12 10 00 10 SP (LINK)

Construction Activities

  • Relocation of rail tracks
  • Installation of trackside equipment
  • Installation of overhead wire footings
  • Civil earthworks and drainage work
  • Delivery of plant and materials
  • Relocating high-voltage power utilities
  • Bridge pier piling works.

TRANSGRID

  • Environmental Handbook (LINK)

Discover more from Construction Methodology

Subscribe to get the latest posts sent to your email.

Leave a Reply

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock

Discover more from Construction Methodology

Subscribe now to keep reading and get access to the full archive.

Continue reading