Australia – Estelle Street: Cable-Stayed Bridge Construction Progress
133-meter cable-stayed bridge construction showcasing advanced engineering similar to Brooklyn Bridge and Pont de Normandie
All about construction, in simple words.
133-meter cable-stayed bridge construction showcasing advanced engineering similar to Brooklyn Bridge and Pont de Normandie
Specialized shotcrete application for ground stabilization using advanced access equipment in challenging embankment conditions
Snowy 2.0 intake diffuser construction utilizing advanced Doka formwork systems for 13,600 m³ concrete structure with specialized shoring
First 10MW floating wind turbine successfully assembled at Port-la-Nouvelle, marking France's most powerful offshore installation
365-tonne surge bin transport across Western Australian outback
Major milestone achieved in Naarm Way Stage 2 with installation of first Super-T beams, advancing Melbourne Airport connectivity
Major renewal of Austria's highest motorway bridge featuring innovative post-tensioning and precision skidding operations
Innovative 3D-printed façade for Tiffany & Co. Cancún store integrates local coral patterns with advanced manufacturing technology
Innovative pre-assembly and precision installation of PM 2 coaters demonstrates advanced manufacturing upgrade implementation
Australia's longest weathering steel bridge construction features record-breaking 143m crane deployment at Molonglo River
We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.