Australia
Bridge Construction
Concrete
Construction
Construction Activities
Construction Methodology
Foundation
Material
Pouring
Yanchep Rail Extension – Romeo Road traffic bridge
Over 400 cubic metres of concrete have been poured as the foundation of the Romeo Road traffic bridge starts to take shape on the Yanchep Rail Extension Source: Link