Tunnel Boring Machines (TBM)

Standards

Standard Code Organization Scope Key Requirements Certification Required
EN 12110 European Committee for Standardization Tunneling Machines Safety, Air locks, Pressure CE marking
EN 12336 European Committee for Standardization Shield Machines Technical requirements Type certification
ISO 19901 International Organization for Standardization Ground Investigation Site assessment Geological certification
ITA Guidelines International Tunneling Association TBM Operations Best practices Compliance verification
IEC 60204 International Electrotechnical Commission Electrical Systems Safety, Controls Electrical certification
EN 16191 European Committee for Standardization Tunneling Safety Safety requirements Safety certification

TBM Types and Specifications:

Type Technical Requirements Application Key Features
Earth Pressure Balance (EPB) Pressure control: 0-6 bar, Torque: 5000-20000 kNm Soft ground, Urban Pressure chamber, Screw conveyor
Slurry Shield Slurry pressure: 0-10 bar, Separation plant High groundwater, Mixed ground Slurry circuit, Treatment plant
Hard Rock TBM Thrust: 20000-40000 kN, Cutterhead power: 5000+ kW Rock formations Disc cutters, Grip systems
Double Shield Stroke length: 1.5-2m, Segment erection Hard rock, Variable ground Telescopic shield, Gripper system
Multi-mode TBM Convertible systems, Multiple modes Mixed ground conditions Adaptable cutting, Variable systems
Mixshield Pressure range: 0-15 bar, Slurry system High pressure, Mixed ground Combined systems, Advanced control

Main Systems:

System Components Specifications Monitoring Required
Cutterhead Disc cutters, Scrapers, Openings Rotation speed: 0-10 rpm, Torque monitoring Wear monitoring, Temperature
Drive System Main drive, Gearbox, Bearings Power: 3000-7000 kW Torque, Temperature, Vibration
Thrust System Cylinders, Thrust ring Force: 20000-80000 kN Pressure, Stroke, Alignment
Segment Handling Erector, Conveyor, Storage Capacity: 6-12 rings/day Position, Load monitoring
Conveyor System Belt system, Transfer points Capacity: 300-1000 m³/hr Speed, Load, Wear
Navigation System Laser, Gyro, Electronic Accuracy: ±25mm Position, Deviation

Ground Control Systems:

System Function Parameters Monitoring
Face Pressure Ground stability 0-15 bar pressure Continuous monitoring
Grouting System Void filling Volume, Pressure control Real-time injection
Ground Treatment Conditioning/Support Foam/Polymer injection Consumption monitoring
Water Control Groundwater management Inflow/Pressure control Flow monitoring
Settlement Control Surface protection Settlement limits Surface monitoring
Gas Detection Safety monitoring Gas types/levels Continuous monitoring

Control and Monitoring:

System Parameters Standards Verification
Main Control Operation parameters IEC 61131 System testing
Navigation Position/Direction ISO standards Survey checks
Ring Building Segment position Project specs Build verification
Ground Parameters Pressure/Volume EN 12336 Continuous monitoring
Machine Data Performance metrics Manufacturer specs Data logging
Environmental Gas/Water/Ground Safety standards Regular testing

Maintenance Requirements:

Component Frequency Type Documentation
Cutters Daily inspection Wear check/Replace Wear records
Main Bearing Monthly check Grease/Seals Service records
Thrust System Weekly check Seals/Alignment Inspection reports
Conveyor Daily inspection Belt/Rollers Maintenance logs
Hydraulics Daily check Oil/Pressure Service records
Electrical Monthly check Systems/Safety Test certificates

Personnel Requirements:

Position Qualifications Experience Certification
TBM Operator Technical training 5+ years Manufacturer cert
Shift Engineer Engineering degree 3+ years Professional reg
Maintenance Team Technical training 3+ years Specialist cert
Ring Builder Technical training 2+ years Safety cert
Control Room Technical training 2+ years System cert
Safety Officer Safety qualification 5+ years Safety cert

Performance Monitoring:

Parameter Target Range Monitoring Recording
Advance Rate 10-40m/day Continuous Daily report
Cutter Wear Life hours Per shift Wear log
Ground Loss <0.5% volume Continuous Settlement data
Ring Build Time/Quality Per ring Build report
Power Usage kWh/meter Continuous Energy log
Downtime <20% Continuous Time log

Emergency Systems:

System Function Testing Certification
Emergency Stop All systems Weekly Safety cert
Fire Suppression Fire control Monthly Fire cert
Gas Detection Safety monitoring Daily Gas cert
Evacuation Personnel safety Monthly Safety cert
Backup Power Critical systems Monthly Electrical cert
Communication Emergency contact Daily System cert

Environmental Control:

Aspect Requirements Standards Monitoring
Noise Control <85dB underground Local regs Sound meters
Dust Control Filtration/Suppression Health regs Dust monitoring
Water Treatment Separation/Cleaning Environmental regs Water quality
Ground Control Settlement limits Project specs Survey monitoring
Waste Management Disposal/Recycling Environmental regs Volume tracking

Documentation Requirements:

Document Content Frequency Storage
Shift Reports Operations data Per shift Project database
Ring Data Build information Per ring Quality system
Maintenance Logs Service records Daily Maintenance system
Survey Data Position/Alignment Per ring Survey database
Quality Records QC/QA data Continuous Quality system
Incident Reports Safety/Technical As needed Safety system
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock