Gantry, air hoists, and round slings for escalator installs at the under construction Carnival Cruise Line Terminal F at the Port of Miami. Provided by Lifting Gear Hire (LGH) Source:...
Hutte Bohrteehnik’s compact class drill rigs HBR 202, with integrated electric motor or diesel engine, was designed to fulfill clients’ need for small drill rigs for large-diameter bores. The...
The project As part of the Sydney Metro Project, Central Station is undergoing a new entrance and central walk in a significant upgrade. Our scope included installation of a contiguous...
Work continues to get Waterloo Station ready for new metro rail services with four escalators now installed. There will be seven escalators at Waterloo Station– three escalators operate between...
A construction method called ‘bottom up’ will be used to build Parkville Station, which involves excavating the box down to its maximum depth, construction and fit out of the box, followed by...