Documentation

20XX, Mitsubishi Electric, Escalators series Z, Link, Source

  • 2018 Thyssenkrupp, Escalators and moving walks, escalating performance, Link, Source
  • 2016 – Kone, Planning Guide for Kone Escalators and autowalks, Link, Source 
  • 2017, Testing and commissioning procedure for lift, escalator and passenger conveyor installation in government buildings og the Hong Kong administrative region, Link, Source 
  • 2015, Australian Elevator association handbook, Link, Source
  • Schindler 9300AE, the worlds leading escalator for safe and reliable passenger transport, Link, Source
  • , Link, Source
  • , Link, Source
  • , Link, Source
  • 1972, SAFE Construction and installation of escalators, code of practice, International Labour Office, Geneva, Link, Source

 

Standards

  • AS 1735.12-1999 Lifts, escalatrs and moving walks, Part 12: Facilities for persons with disabilities
  • AS 1735.12-1999 AMDT 1 Lifts, escalators and moving walks, Part 12: Facilities for persons with disabilities
  • AS/NZS 4431:1996 Guidelines for safe working on new lift installations in new constructions
  • ISO/TC 178 – Lifts, escalators and moving walks

Images

  • Balaustrade

 

Arrangements

  • Single unit arrangement
  • Continuous arrangement (one-way traffic)
  • Interrupted arrangement (one-way traffic)
  • Parallel interrupted arrangement (two-way traffic)
  • Crisscross continuous arrangement (two-way traffic)
  • Scissor Arrangement

 

 

Parts

  • Balaustrade
  • Cladding
  • Controller
  • Emergency Stop Button
  • Escalator Pit
  • Handrail
  • Handrail Belt
  • Handrail Drive
  • Skirt
  • Speed Governor
  • Steps
  • Step Tracks

 

Parts, Documentation

 

Videos

Escalator Installation by ThyssenKrupp ENG

KCI Airport New Terminal Escalator Install July 2021

Escalator 1 Installation (ground to 2nd floor)

Time Lapse of Escalator Installation at Commercial–Broadway Station

Leave a Reply

Your email address will not be published. Required fields are marked *