Glazed link bridge drops neatly into place.
SH Structures installed a 19m long link bridge at The Forum Kings Quarter development in Gloucester. The 44te structure was installed complete with it’s glazing in place ensuring it could be used as access between the two sites immediately. These operations take meticulous planning and coordination but once again the end result justifies the additional stress it gives the site team.
Congratulations to all those involved. SH Structures Ltd Novum Structures Kier Group glazedbridge steelbridge linkbridge
Discover more from Construction Methodology
Subscribe to get the latest posts sent to your email.